A second sidetrack, EBO-1 ST2, was completed and logged, successfully delineating the new pool. The EBO-1 well was sidetracked twice for geological reasons. Both sidetracks were drilled to the Gamba and Dentale sandstone reservoir formations and were logged. Wireline logs indicate that a 15.5 metre oil column was encountered within the Gamba reservoir. A wireline oil sample was taken from the pay interval and confirms the presence of approximately 36 degree API oil, similar to that from the adjacent Etame field. The logs from the sidetracks confirm a continuous oil-water contact between the original well and its two sidetracks.
|